Non-Slewing Mobile Crane
TLILIC608A Licence to operate a non-slewing mobile crane (greater than 3 tonnes capacity)
Pre-requisite: Nil
Unit Descriptor
|
This unit specifies the outcomes required to operate a mobile crane of greater than 3 tonnes capacity that incorporates a boom or jib which includes articulated type mobile cranes and locomotive cranes, but does not include vehicle tow trucks, for licensing purposes. |
| Element |
Performance Criteria |
||
| 1. | Plan work. | 1.1 | Potential workplace hazards are identified. |
|
1.2 |
Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment. |
||
| 1.3 | The weight of the load is identified and estimated in consultation with associated personnel. | ||
|
1.4 |
Crane is appropriate to the load/s and workplace conditions. |
||
|
1.5 |
The appropriate path for the movement of loads in the work area is inspected and determined. |
||
|
1.6 |
Appropriate communication methods are identified with associated personnel. |
||
| 2. | Conduct routine checks |
2.1 |
Crane is visually checked for any damage or defects. |
|
2.2 |
Crane is accessed in a safe manner. |
||
|
2.3 |
All signage and labels are visible and legible according to the appropriate standard. |
||
|
2.4 |
Routine pre-operational crane checks are carried out according to procedures. |
||
|
2.5 |
All controls are located and identified. |
||
|
2.6 |
Crane service logbook is checked for compliance. |
||
|
2.7 |
Crane is started according to procedures and checked for any abnormal noises. |
||
|
2.8 |
All crane safety devices are tested according to procedures. |
||
|
2.9 |
Pos-start operational checks are carried out according to procedures. |
||
|
2.10 |
All communication equipment is checked for serviceability. |
||
|
2.11 |
All damage and defects are reported and recorded according to procedures, and appropriate action is taken. |
||
| 3. | Set up crane. |
3.1 |
Ground suitability is checked. |
|
3.2 |
Crane is driven to the work area according to procedures. |
||
|
3.3 |
Crane is positioned for work application and stability according to procedures. |
||
|
3.4 |
Appropriate crane configuration for work task is determined according to procedures (where applicable). |
||
|
3.5 |
Boom/jib and counterweight configuration data is input into the crane computer (where applicable). |
||
|
3.6 |
Appropriate hazard prevention/control measures are applied to the work area according to procedures. |
||
|
3.7 |
All communications equipment is tested for functionality. |
||
| 4. | Transfer load. |
4.1 |
Lifts are determined within the capacity of the crane. |
|
4.2 |
Boom/jib and hoist block is positioned over load following directions from associated personnel. |
||
|
4.3 |
Test lift is carried out according to procedures. |
||
|
4.4 |
Loads are transferred using all relevant crane movements according to procedures and the appropriate standard. |
||
|
4.5 |
All required communication signals are correctly interpreted according to procedures and the appropriate standard. |
||
| 4.6 |
Crane is operated according to procedures. |
||
|
4.7 |
Load movement is monitored constantly ensuring safety to personnel and load, and crane stability. |
||
|
4.8 |
Unplanned and/or unsafe situations are responded to in line with procedures. |
||
| 5. | Mobile load. |
5.1 |
Suitability of planned route is checked for the crane according to procedures. |
| 5.2 | Crane is configured to mobile load according to procedures. | ||
|
5.3 |
Load is moved using best mobile practice according to the appropriate standard. |
||
| 6. | Shut down and secure crane. |
6.1 |
Crane boom/jib and equipment is stowed and secured, where appropriate, according to procedures and the appropriate standard. |
| 6.2 | Relevant motion locks and brakes are applied (where applicable). | ||
|
6.3 |
Outriggers/stabilisers are stowed and secured according to procedures (where applicable). |
||
|
6.4 |
Crane is shut down according to procedures. |
||
| 6.5 | Routine post-operational crane checks are carried out according to procedures. | ||
|
6.6 |
Plates or packing are stowed and secured (where applicable). |
||
| 6.7 | All damage and defects are recorded and reported according to procedures, and appropriate action is taken. | ||
![]() |


