CPCCLSF4001A Licence to Erect, Alter and Dismantle Scaffolding – Advanced Level
CPCCLSF4001A Licence to erect, alter and dismantle scaffolding advanced level – Duration 4 Days plus pre-work.
(A Learner’s Workbook must be completed prior to the course in order to meet the course nominal hours. The Learner’s Guide & Workbook will be sent to you electronically at the time of enrolment).
Pre-requisites: CPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level
Unit descriptor | This unit CPCCLSF4001A Licence to erect, alter and dismantle scaffolding advanced level specifies the outcomes required to erect, alter and dismantle scaffolding at the Advanced level. Scaffolding consists of all intermediate scaffolding work including all other scaffolding work connected with the use and operation of Hung scaffolds and Suspended scaffolds for licensing purposes. |
ELEMENT | PERFORMANCE CRITERIA |
1. Plan job. | 1.1. Task to be undertaken is assessed1.2. Potential workplace hazards are identified.1.3. Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment.1.4. Site information is obtained.1.5. Scaffold, associated equipment and scaffold equipment are identified from site information in consultation with appropriate personnel.1.6. Safety equipment is identified.1.7. All forces and loads exerted on and by the scaffold and/or scaffolding equipment are determined and calculated.1.8. Appropriate communication methods are identified with appropriate personnel. |
2. Select and inspect equipment. | 2.1. Scaffold, associated equipment and scaffold equipment are selected and inspected according to procedures and site information.2.2. Safety equipment is selected and inspected according to procedures.2.3. All defective scaffold, associated equipment and scaffold equipment are isolated according to procedures.2.4. All defective scaffold, associated equipment, scaffold equipment and safety equipment are reported and recorded according to procedures.2.5. Communication equipment is selected and inspected for serviceability (where applicable). |
3. Set up task. | 3.1. Appropriate hazard prevention/control measures are applied to the work area according to procedures.3.2. Scaffold and scaffold equipment are prepared for erection according to procedures.3.3. Fit safety equipment and secure according to procedures (where applicable). |
4. Erect scaffold and scaffolding equipment. | 4.1. Scaffold and scaffold equipment are erected according to procedures and the appropriate standard.4.2. Work is conducted safely at heights including safe and effective use of safety equipment.4.3. Scaffold and scaffold equipment are erected consistent with site information.4.4. Appropriate communication methods are used to coordinate the tasks.4.5. Completed tasks are inspected for compliance with the appropriate standard.4.6. Handover certificate is completed as required and handed to appropriate personnel.4.7. Excess materials from the work area are removed (where applicable). |
5. Dismantle scaffold and scaffolding equipment. | 5.1. Scaffold and scaffold equipment is dismantled according to procedures and the appropriate standard.5.2. Work is conducted safely at heights including safe and effective use of safety equipment.5.3. Scaffold, associated equipment and scaffold equipment are inspected for damage and defects.5.4. All damaged and defective scaffold, associated equipment and scaffold equipment is tagged and isolated in accordance with procedures.5.5. Hazard prevention/control measures are removed (where appropriate).5.6. All damaged and defective scaffold, associated equipment and scaffold equipment are reported and recorded according to procedures and appropriate action taken. |