TLILIC0005 Licence to Operate a Boom-type Elevating Work Platform (boom length 11 metres or more)
TLILIC0005 Licence to operate a boom-type elevating work platform (boom length 11 metres or more) – Duration 2 Days face to face plus approximately 16 hours pre-work.
(A Learner’s Workbook must be completed prior to the course in order to meet the course nominal hours. The Learner’s Guide & Workbook will be sent to you electronically at the time of enrolment).
Pre-requisites: Nil
Unit descriptor
|
This unit TLILIC0005 Licence to operate a boom-type elevating work platform (boom length 11 meters or more) specifies the outcomes required to operate a boom-type elevating work platform (boom length 11 metres or more) for licensing purposes, and involves the operation of a telescoping device, hinged device, or articulated device or any combination of these used to support a platform on which personnel, equipment and materials may be elevated to perform work. The 11 metre boom length shall be taken to mean the greater of the following:
(a) The vertical distance from the floor of the platform to the surface supporting the elevating work platform with the platform at its maximum height; or
(b) The nominal reach, measured horizontally from the centre point of rotation to the outer edge of the platform in its most extended position.
|
Element |
Performance Criteria |
||
1. |
Plan work |
1.1 |
Potential workplace hazards are identified. |
1.2 |
Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment. |
||
1.3 |
Elevating work platform is appropriate for the task. |
||
1.4 |
Appropriate communication methods are identified. |
||
2. |
Conduct routine checks. |
2.1 |
Service logbook for elevating work platform is checked for compliance. |
2.2 |
Elevating work platform is visually checked for any defects or damage according to procedures. |
||
2.3 |
Routine pre-operational checks are carried out according to procedures. |
||
2.4 |
Safety equipment is inspected according to procedures. |
||
2.5 |
Elevating work platform is accessed in a safe manner. |
||
2.6 |
Fit safety equipment and secure to platform according to procedures. |
||
2.7 |
All controls are located and identified. |
||
2.8 |
Elevating work platform is started according to procedures. |
||
2.9 |
All safety devices are identified and tested according to procedures. |
||
2.10 |
Post-start operational checks are carried out according to procedures. |
||
2.11 |
All communication equipment is checked (where applicable). |
||
2.12 |
All defects and damage are reported and recorded in according to procedures, and appropriate action is taken. |
||
3. |
Set up elevating work platform. |
3.1 |
Ground suitability is inspected and checked. |
3.2 |
Elevating work platform is driven to or located at work area according to procedures (where applicable). |
||
3.3 |
Elevating work platform is positioned for work application and stability according to procedures. |
||
3.4 |
Appropriate hazard prevention/control measures are applied to the work area according to procedures |
||
3.5 |
Work gear and tools are stowed and secured |
||
4. |
Operate elevating work platform. |
4.1 |
Elevating work platform is operated using all relevant plant movements according to procedures and the appropriate standards. |
4.2 |
Elevating work platform is mobiled using best mobile practice and appropriate procedures. |
||
4.3 |
Elevated working platform operations are monitored constantly ensuring safety of personnel and stability. |
||
4.4 |
Unplanned and/or unsafe situations are responded to in line with procedures. |
||
5. |
Shut down and secure elevating work platform. |
5.1 |
Elevating work platform is lowered and stowed according to procedures. |
5.2 |
All relevant motion locks and brakes are applied (where applicable). |
||
5.3 |
Safety equipment is disconnected from platform. |
||
5.4 |
Egress from elevated work platform is conducted according to procedures. |
||
5.5 |
Outriggers/stabilisers are stowed and secured according to procedures (where applicable). |
||
5.6 |
Plates or packing are stowed and secured (where applicable). |
||
5.7 |
Elevating work platform is shut down according to procedures. |
||
5.8 |
Routine post-operational checks are carried out according to procedures. |
||
5.9 |
All defects and damage are reported and recorded according to procedures, and appropriate action is taken. |